Kitchen renovation countertops in Calgary: sequence it right

Template the countertop after the cabinets are set, and tile the backsplash after the counter is in. Get that order wrong and it is the most expensive mistake in a Calgary kitchen renovation, and it does not happen at the stone yard. Here is the full sequence, and what to decide early.

White speckled L-shaped countertop with a double sink in a Calgary kitchen with oak cabinets and a tiled backsplash
✓ Free in-home measure, zero obligation ✓ Written quote in 24 hrs ✓ No showroom markup, no hidden fees ✓ 100+ real Calgary installs
The correct order

Kitchen renovation sequence: what goes when

01.

Choose your stone (early)

Countertop selection should happen in the planning phase, well before demo begins. If you have your eye on a specific natural stone slab, buy it and hold it immediately, good slabs sell. For quartz, selection can happen later since it's manufactured to order.

02.

Cabinets are installed and levelled

This is the prerequisite for everything that follows. Do not template or order countertops until your cabinets are physically installed, secured and levelled. If the cabinets shift after templating, the stone won't fit.

03.

Call us to template

Once cabinets are set, call us. We measure from the actual installed cabinets, confirm sink and cooktop positions, verify island dimensions and note any walls that are out of square (they always are, and we compensate for it in the cut).

04.

Countertops fabricated

Fabrication and install together take 14 days from when you approve the quote. The kitchen is without counters for this window, worth planning around for families with young kids or anyone who needs the kitchen functional.

05.

Countertops installed

Stone goes in. Sink and cooktop cutouts made and fitted. Edges polished. Silicone applied at backsplash wall and undermount sink. The kitchen is now functional again.

06.

Backsplash after countertops

Tile the backsplash after the countertops are in. The tile sits on top of the counter surface at the base, creating a clean transition. Installing backsplash first and then trying to fit the counter underneath it causes gaps and alignment headaches.

Common mistakes

What goes wrong in Calgary kitchen renos, and how to avoid it

Ordering stone before cabinets are set

The single most common error. Drawings are not accurate enough for stone fabrication. We template from physical cabinets. If your contractor pushes you to order countertops from a plan to save time, push back. It saves nothing if the stone doesn't fit.

Choosing stone in a showroom under fluorescent light

Stone looks completely different in showroom lighting than in your kitchen. Always bring home a sample and hold it against your cabinets in your own light before committing. We can bring samples to your home at the free measure. We do this routinely.

Not holding the slab you want

A specific natural stone slab you love will not wait. Stone yards sell continuously. If you see the exact slab, buy it or put a deposit on it. A good slab for a popular kitchen project can be gone within a week of arriving at the yard.

Forgetting about appliance cutouts

Sink, cooktop, and any downdraft vent cutouts need to be confirmed before fabrication. Have the actual appliance or its spec sheet ready at templating. Approximate dimensions cause rework.

Coordinating with your contractor

We work alongside your general contractor

We do this every week with Calgary contractors and renovators. If your GC wants to coordinate the countertop timeline directly with us, we're happy to work that way.

  • ✓We handle plumbing disconnection and reconnection so your plumber isn't required to be there
  • ✓We communicate directly with your project manager if that's your preferred workflow
Kitchen partway through a renovation, with a long light grey veined countertop run and waterfall end panels beside grey lower cabinets, in a Calgary home
FAQ

Kitchen renovation countertop questions

When should I order countertops during a kitchen renovation?
After your cabinets are installed and levelled. We template from the physical installed cabinets, not from drawings. Ordering early based on plans is the number one source of measurement errors in Calgary kitchen renovations.
Should I choose countertops or cabinets first?
Cabinets usually first. They're the larger investment and set the kitchen's character. But if there's a specific natural stone slab you love, secure it early and build your cabinet colour around it. We can bring stone samples to your home at the free measure so you see how everything works together.
Does the backsplash go in before or after the countertop?
After. The countertop goes in first, then the backsplash tile sits on the stone at the base. Installing backsplash first and trying to fit the counter underneath creates gaps and alignment problems that are expensive to fix.
How long will my kitchen be without a countertop?
Plan for about 2 weeks: install is typically 14 days after you approve the quote.
Planning a renovation?

Talk to us early in the process

The earlier you call, the better we can fit your timeline. We'll work with your contractor and make sure the countertops don't slow anyone down.

Call Now Free Quote

Where is your kitchen?

So we can show you the right phone line and service area.

We only install in these areas.